The cornerstone of Lexington’s appeal—its exceptional public school system—is secured for the next generation. Following a monumental town-wide vote, the plan to construct a New Lexington High School (LHS) is officially a go, locking in a $660 million investment into the community’s future.
This is more than a construction project; it’s a powerful validation of the enduring value of Lexington MA real estate and a commitment to 21st-century education.
Key Project Status & Financial Facts
The successful Debt Exclusion Vote on Monday, December 8, 2025, was the final local hurdle, ensuring the project moves forward and securing critical state funding.
| Key Project Metric | Details |
| Official Project Status | Approved and Funded (Debt Exclusion Passed) |
| New School Name | LHS Bloom Design |
| Total Cost | $660 Million (One of the most expensive in MA) |
| State Funding Secured | approximately $118.8 – $121.7 Million$ (MSBA Grant) |
| Capacity | 2,395 Students (Designed for flexibility/expansion up to approximately 3,000) |
| Anticipated Opening | 2029-2030 School Year |
| Real Estate Impact | Stabilizes & Enhances Lexington Property Values |
The approved Bloom design addresses years of severe overcrowding (the old 1953 campus serves 2,400+ students in a space designed for 1,800) and failing infrastructure.
1. Educational & Safety Improvements
-
Single-Building Campus: Moving from an open, multi-building campus (which currently poses security and weather challenges) to a single, easily secured, four-story building.
-
Flexible Learning: Includes “breakout rooms” and spaces designed for project-based, interdisciplinary learning, a key feature missing in the current, outdated layout.
-
ADA Compliance: The new school will be fully accessible, resolving long-standing issues with ramps and elevators in the current facility.
2. Sustainability and Green Technology
Lexington is building a model for environmentally responsible school construction. These features also translate into long-term operational savings for the town.
-
All-Electric Design: The school will use hybrid air-source and ground-source heat pumps instead of fossil fuels for HVAC.
-
Massive Solar Array: Installation of an 4,800 kW solar panel system and a battery storage system (2MW / 8MWh).
-
Energy Savings: The town projects savings of up to approximately $90 million over 30 years in maintenance and energy costs.
3. Construction Phasing
To ensure minimal disruption, the new approximately 460,000 square foot school will be built on the current athletic fields. Once complete, the existing school will be demolished, and new, modern recreational fields will be constructed on that footprint. The plan includes an 8-acre land swap to guarantee no net loss of recreational land for the community.
The Real Estate Advantage in Lexington MA
The most significant takeaway for current and prospective homeowners is the long-term stabilization and enhancement of property values.
-
Secured Educational Excellence: The successful funding vote removes uncertainty and reaffirms Lexington’s commitment to top-tier education, a primary factor attracting high-value buyers.
-
Tax Impact Transparency: Residents can now reference the town’s Tax Impact Calculator, which showed the tax rate for a $1 million property peaking at approximately $1,300$ per year (about 7.6% of the total tax bill) in 2036, before gradually declining. This transparency helps mitigate buyer fear regarding potential tax spikes.
-
Modern Infrastructure: The inclusion of sustainability features and a modern, safe campus ensures the high school asset will not be a drain on future town budgets, preserving fiscal health.
As your local Lexington real estate experts, The Mazur Team, recognizes this project as a critical investment in future generations of Lexington residents and a tangible step toward ensuring stable community prosperity. Lexington Public Schools are consistently some of the best in the country; this successful vote guarantees the town’s educational infrastructure will be modernized to a standard to match it, making Lexington a secure and desirable place to call home for the next generation.
Considering buying a home in Lexington to access this world-class school system, ready to sell your current property to capitalize on Lexington’s enhanced desirability, or curious about your home value? Contact The Mazur Team today for expert guidance and a personalized market analysis.
